The Solar Guild is still operated by a small central team. It does not yet have mature independent governance, a member-controlled board, or an independently operating standards body. The public should not be asked to pretend otherwise.
The goal is a system where authority comes from demonstrated responsibility, remains limited to scope, can be challenged, and survives the absence of any one person.
Contents (4 sections)
Current correction route
Active workThe current editorial and operating team remains responsible for receiving public corrections because Solar Standard Institute is still being built and neither it nor an independent governance body currently holds that authority. A correction should identify the page or decision, the challenged statement, the supporting source or reasoning, and any urgency or potential harm.
Submissions are reviewed centrally today. That is an operating fact, not an independence claim. Material corrections should change the affected page, preserve the reason for the change, and update connected claims where necessary.
Minimum governance before scale
Proposed- Named responsibility for privacy, safety, finances, content, review, and incident response.
- Conflicts and funding relationships that affected a decision are visible.
- Material claims can be challenged and corrected.
- Contributors have a response and appeal path for consequential records.
- Access and authority can be suspended when risk or abuse appears.
- A continuity plan lets another qualified person maintain or wind down the work.
Funding without capture
Proposed- Money may fund Objectives, access, review, tools, translation, or operations.
- Money does not buy favorable findings, worker data, private access, votes, standards exceptions, or review outcomes.
- Productive commercial work should follow its agreed compensation terms without making the funder the final judge of a contributor's overall capability.
- Material funder influence must be disclosed even when no formal vote changes hands.
What happens when something fails
ProposedThe response should fit the problem: correct a page, narrow a claim, pause a tool, remove access, change leadership, transfer an Objective, partner with a better institution, or close the affected work. The smallest responsible repair should come before dramatic institutional theater.
References and limits
This page is published by The Solar Guild. Sources are listed so readers can inspect the basis of the page. A project statement is not independent proof unless the page identifies supporting outside evidence.
- Current governance and anti-capture analysis of The Solar Guild
- Public contributor-rights and correction requirements